Sarajevo Airport has open tender procedure for platform
expansion worth 3 million Euros.
The existing platform is rectangular in shape with a total
area of 38.000 m2 (including Apron Taxi line) and can accommodate 7 aircraft
of ICAO code C (Airbus A320 or Boeing 737 family) or more (up to 12 different
types and smaller dimensions).
On the east side of the existing platform, next to the edge
of the parallel taxiway A, will be a zone of the future construction site, with
a floor area of approximately 18.802 m2. The work will be done in two phases.
In Phase 1, four new aircraft parking positions will be
built for aircraft class C (Airbus A320 or Boeing 737 family) . The area of
the new stands, with four parking positions is approximately 9.151 m2. Phase
2 will include one more parking position for same type of aircraft. After both
phases are finished, airport will have 12 aircraft parking positions.
Also, work on the reconstruction of the existing parking
position number 1 is planned, the total area of reconstruction work is
approximately 2,493 m2. Approximately 3,500.00 m3 of concrete will be used to build
the planed area, also extensive electrical and water drainage works are planned
to accompany the construction of the extended platform with four new parking
positions.
For tender terms and conditions please follow this link (in Bosnian
only)
Source: Sarajevo Airport and Flying Bosnian